There’s a new spectator attraction at Eyemouth Harbour, as dredging work is currently being carried out.
During the operation, all vessels must contact the Harbour Master or MV Reclaimer on channel 12 before entering or departing the harbour. ’MV Shearwater’ will monitor VHF channels 12 and 16 – and they should navigate with caution in the vicinity.
In particular they should ensure that the dredging vessels are not operating in the entrance (‘canyon’) before committing to enter or depart.
Our photographer Stuart Cobley took this video of the dredging in action.